Good couple of hours in the garage today and for once everything I did went as planned Got the footboards drilled and countersunk on both sides of NUDGER so the anti swivel bars are in place Then I cut/drilled and filed the heel plates and got them mounted as well of course a tow bar is not a tow bar without a tow ball at the back So that’s next
Sitting on the seat at the moment All this has to be stripped back apart when I’ve finished fabricating it all so it can go for Powdercoating....BLACK
Some early Japanese bikes of the '60s/'70s/80s had frame welding that left a lot to be desired. And it was in full view, give or take a coat of paint. Dilli has nothing to fear from the welding inspectors - probably!
Just bolted in place for the time being gonna try and make the 7 pin socket carrier tomorrow at work if no-ones looking
Dilli's mate, Clive Edmonds, has a look at it, says "that looks okay" and confirms it in writing on the back of a fag packet which he then signs. Ergo, certified by CE. Simples!